A £700k restoration project In partnership with Jacobs Engineering & Wilf Noble Civil Engineering.
The GRP bridge refurbishment made North Yorkshire County Council one of three principal winners in the 2011 Historic Bridge and Infrastructure Awards.
The Spa Bridge in Scarborough, first opened to the public in 1827, was in need of extensive renovation. The £700,000 project was a general restoration including new timber beams spanning the full width of the bridge, replacement of the main bridge deck and refurbishment and repainting of all metal components.
To reduce weight, but maintain strength and load bearing requirements, solid top pultruded GRP grating was selected as the deck sub-base for the pavement surfacing. This was installed on top of the new timber frame. GRP pultruded profiles were also installed to house the drainage channels running along the sides of the walkway.
The environmental sustainability and colour of the pultruded grating were considered by the designers as it had to blend and compliment the wooden beam structure. These were key factors to satisfy the requirements set out by both North Yorkshire County Council and English Heritage.
The bridge was closed to the public from November 2009 through to April 2010 and despite the severe winter, contractors and partners worked hard to complete the task within the scheduled time frame. On completion, the Council’s Chief Bridge Engineer commented: “A great deal of forethought has gone into the engineering of this project and I think the bridge now looks magnificent, something that everybody in Scarborough can be very proud of”.
27th March 2020
We would like to reassure all customers and enquirers that we remain open for business, while carefully following Government guidelines issued here:
https://www.gov.uk/coronavirus
The majority of our administration staff are working remotely and we have rostered production staff to make numbers available to meet demand.
We are able to provide the full range of our standard products from stock to serve any ongoing requirements you may have and will be pleased to receive any invitations to quote for future projects.
At the present time, in accordance with social distancing regulations we will not be conducting face to face meetings with business partners until further notice. However it may be possible to arrange video link meetings if required, please contact us for further information.
Collections of orders from our workshops are possible, by prior arrangement only please and visitors are reminded to observe the standard 2m distancing rules, for the safety of all.
Our transport partners are all providing us with a normal service.
We will update this statement if required and following any further guidance issued by the UK Government.
We wish you well.