Prince William Footbridge – Fort Amherst, Chatham

In collaboration with Birse Civil Engineering and Wright Engineering, Evergrip supplied a GRP Grating system with anti-slip surface to this new build project.

Application

Wright Engineering contacted Evergrip with a requirement for a GRP Grating deck with anti-slip surface to cover the span of a new footbridge designed by Mott MacDonald.

Grating panels with a factory bonded 4mm GRP anti-slip sheet surface were supplied alongside GRP open mesh grating used for drainage covers, along the edges of the walkway.

The bridge itself was an Institution of Civil Engineers Structure Award Winner in 2011.

Sector

Pedestrian bridges

Product Types

GRP Grating Walkway

Prince William Footbridge Anti-slip Solid Top Surface

Summary

The new GRP anti-slip grating deck covers the span of the pedestrian bridge, built across an historic defensive ditch and provides for safe access into the visitor site at Fort Amherst, Britain’s largest Napoleonic fortress.

CONTACT US BELOW
Phone IconCALL OUR TEAM ON 01757 212744

Evergrip Limited

Flaxley Road, Selby, North Yorkshire
YO8 4BG United Kingdom

PHONE: 01757 212744
EMAIL: info@evergrip.com
Company Registered Number: 04186772
Registered for VAT Number: GB 773 5346 10

Terms & Conditions
Privacy Notice

Twitter feed is not available at the moment.
CONTACT US
Twitter Logo LinkedIn Logo Youtube Logo

27th March 2020

We are open for business

Covid 19 - Confirmation Statement

We would like to reassure all customers and enquirers that we remain open for business, while carefully following Government guidelines issued here:

https://www.gov.uk/coronavirus

The majority of our administration staff are working remotely and we have rostered production staff to make numbers available to meet demand.

We are able to provide the full range of our standard products from stock to serve any ongoing requirements you may have and will be pleased to receive any invitations to quote for future projects.

At the present time, in accordance with social distancing regulations we will not be conducting face to face meetings with business partners until further notice. However it may be possible to arrange video link meetings if required, please contact us for further information.

Collections of orders from our workshops are possible, by prior arrangement only please and visitors are reminded to observe the standard 2m distancing rules, for the safety of all.

Our transport partners are all providing us with a normal service.

We will update this statement if required and following any further guidance issued by the UK Government.

We wish you well.